Deployment tents with solar power

The deployment tent with solar power

Solar power and battery storage for accommodation, command centres and supply stations.

HR-Structures MTE deployment tent with two solar panels on one roof section
RETTmobil Fulda · May 2026

Solar power for planned deployments.

Whether used as accommodation, a command centre or a supply station, the modular deployment tent from HR-Structures is designed for temporary and longer-term operations. The PV mounting system is already integrated into the roof fabric. Once the tent is erected, the panels are slid in from the eaves.

  • 6 m wide, extendable in 3 m increments
  • Install solar panels without walking on the roof
  • Solar power and battery storage tailored to your needs

Tent components can be supplied in olive green or other colours on request.

Download datasheet (PDF, approx. 550 kB) ↓

Example configurations

MLXL
6 m9 m840 Wp6 m9 m1,680 Wp6 m9 m3,360 Wp
Daily electricity generation · March–OctoberAvg. 2.6 kWh/dayAvg. 5.2 kWh/dayAvg. 10.5 kWh/day
In winter (Nov–Feb)Avg. 0.6 kWh/dayAvg. 1.2 kWh/dayAvg. 2.5 kWh/day
Matching battery storage2 kWh4 kWh6 kWh (expandable to 30 kWh)
Can also be combined with a generator.In particular during the darker months, a suitable generator can recharge the battery. Depending on consumption and system design, the generator can then be switched off for periods, reducing its running time.
Calculation notes and sources

How the figures are calculated

Daily electricity generation for March–October and November–February: These figures are rounded seasonal daily averages, not guarantees for individual days. They are based on a long-term PVGIS 5.3 model (SARAH3, 2005–2023) for Cologne, assuming an 18° roof pitch and 14% system losses. For M, one side of the roof faces east; for L and XL, the panel area is split equally between east and west. The calculation uses 245 days for March–October and 120 days for November–February. Actual generation depends on factors including weather, orientation and shading. The figures are before battery storage losses; less electricity may be usable after storage. The specific battery allocation and generator connection still require project-specific technical verification. PVGIS · European Commission

The complete system – turnkey.

Three coordinated components. One system ready for deployment.

HR-Structures
Tent frame and accessoriesHR-Structures
SEYTECO · Seybold TK
Roof fabricSeybold TK
Solar panels & batterySeybold PV
Complete systemOne coordinated system

Get in touch.
We will be happy to advise you.

Contact us

Developed together with HR-Structures.